Energized on August 16 2012

The solar modules were installed in the early summer. On August 16 all the parts where in place including the inverters connecting the plant to the grid.

120 Solar Modules

The plant is built of 120 solar modules rated at 210 to 250 W. This gives a nominal power of 30 kW for the plant in total.

Top 10 days production

MonthDayYearProduced Energy
June22017226.2 kWh
June122018224.9 kWh
June42016224.6 kWh
June52016223.7 kWh
May292014223.4 kWh
June282017222.2 kWh
June42018221.7 kWh
May182018220.6 kWh
July12017220.5 kWh
June142016219.1 kWh

Month filter:

Top 10 weeks production

WeekYearProduced Energy
22 20181408.2 kWh
20 20181384.5 kWh
21 20181368.3 kWh
22 20161342.3 kWh
17 20141335.9 kWh
18 20161326.9 kWh
27 20181326.8 kWh
23 20181316.2 kWh
26 20171301.3 kWh
34 20151265.0 kWh

Peak power 10 minutes

PeriodDateStartEndPower
10 minutes2017-05-1012:0012:1030.2 kW
10 minutes2015-06-1613:3013:4029.5 kW
10 minutes2015-06-0813:5014:0029.4 kW

Peak power 1 hour

PeriodDateStartEndPower
1 hour       2018-06-0512:5013:5027.3 kW
1 hour       2018-06-0513:0014:0027.1 kW
1 hour       2018-06-0512:4013:4027.0 kW

Total production

The solar plant has produced 169561 kWh in 2411 days.This gives an average energy production of 70.3 kWh/day.

Current status

Right now the solar plant is connected to a 12 kV transformer at STRI. This enable us to also connect other power sources like biogas generator and battery storage. A battery storage was installed during summer 2013 and is now in operation.